Contract · Federal · Small Business Set Aside - Total
Split-Unit HVAC Replacement
- Agency
- DEPT OF DEFENSE / US SPECIAL OPERATIONS COMMAND (USSOCOM)
- Location
- Joint Base Lewis McChord, WA
- Amount
- Amount not listed
- Posted
- Sep 14, 2026
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors look up NAICS codes
- PSC code
- N041
Timeline
-
Posted
Sep 14, 2026
-
Status
Closing soon
What contracts like this typically pay
est. $24K-$183K
This is not this contract’s value. It’s what the government has actually paid for comparable work in the past. How we estimate this.
What this contract is for
- Agency
- DEPT OF DEFENSE / US SPECIAL OPERATIONS COMMAND (USSOCOM)
- Location
- Joint Base Lewis McChord, WA
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
- Scope
- Federal
All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT).
A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT).
Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433.
Desription of Work This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems.
The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems.
The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards.
The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units.
Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed.
The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.
Official solicitation and documents
The full solicitation, any attachments, and the actual submission instructions live on the official listing, not on this page. Oppward summarizes public record data; it does not host or mirror the source documents.
Oppward is an independent service and is not affiliated with, endorsed by, or sponsored by SAM.gov or any government agency. This page is a plain-English summary of public record data; the linked source above is the authoritative listing.
How to bid on this
This is a contract solicitation, not a grant. To bid, you submit a proposal (usually a price and a description of how you would do the work) directly to the government, through the channel the official listing specifies, not through Oppward.
- Make sure your business has an active SAM.gov registration. You cannot be paid on a federal contract without one.
- Read the full solicitation on the official listing above, especially the scope of work, not just this summary. Our guide to reading a solicitation walks through what to look for.
- Check the set-aside listed above and confirm your business actually qualifies for it before you spend time on a proposal. See our guide to set-asides if the category is unfamiliar.
- Submit your proposal by the deadline, using the exact submission method the official listing states. A technically on-time bid sent the wrong way is often treated as late.
Read our guide: Government construction and trades contracts: how they work
Get contracts like this one matched to your business, free.